Type keywords to see matching pages. Press Enter to open the first result.

Project Time

2023

Location

Myanmar

Annual Output

35,000 tons/year

Target Product

TSR 10/20

Project Introduction:2023 Myanmar 35,000-Ton Dry Rubber Line

One of Myanmar's largest and most automated rubber primary processing projects, built as a modern demonstration factory.

Process & Configuration

Process Flow:Auto grab feeding -> Heavy slab breaking -> Multi-stage intensive washing -> Continuous squeezing and creping -> Smart granulation -> Large-channel drying -> Robotic palletizing

Main Equipment:Automatic grab crane -> Large breaker set -> Stepwise washing system -> Heavy-duty creper set -> Intelligent drying control -> Fully automatic packing and palletizing line

Advantages & Recommendations

  • High industrialization benchmark
  • Full-line PLC integrated control
  • Very high labor productivity
  • Compliant with strict tire-factory audit standards

Project Suggestion:A top-tier industrial setup suitable for large multinational groups planning long-term regional capacity.

Site Photos

2023 Myanmar 35,000-Ton Dry Rubber Line
2023 Myanmar 35,000-Ton Dry Rubber Line
2023 Myanmar 35,000-Ton Dry Rubber Line
2023 Myanmar 35,000-Ton Dry Rubber Line
2023 Myanmar 35,000-Ton Dry Rubber Line
How can we assist you?
Feel free to contact us directly!